Sheet Metal Takeoff – Test 2

Riser Ductwork #1

In the following series of test there will be no numbered items given. It will be up to you to determine what you need. Start as always at the source or the largest duct and continue along the main until you get to the end, and then go back and pickup each branch.

Make sure that you have completed all the practice test first.

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following takeoffs. These forms have more spaces than you should need for each test.

Write down a description of the duct or fitting along with the appropriate size if shown. After you have completed your takeoff, check your answers with the online answer sheet.

Exclude the 32” x 32” branch connection on the riser from your takeoff.

Sheet Metal Riser Ductwork #1 Takeoff Test
Sheet Metal Riser Ductwork #1 Takeoff Test

Fill in the PDF Takeoff Form with answers to Riser Ductwork #1 Image Above.

Sheet Metal Riser Ductwork #1 - Sheet Metal Takeoff Test #2 Form
Sheet Metal Riser Ductwork #1 – Sheet Metal Takeoff Test #2 Form

Vertical Fan Coil – Supply, Return & OSA Ductwork #2

Start with the Supply, then the Return and finish with the OSA ductwork.. Do your best to identify every piece of duct or fitting. In order to do a proper takeoff in this example you’ll need to review Section View “A” in order to correctly identify all the pieces required.

Again, don’t worry about the lengths of ducts, just indicate that there is a section of duct required. Download the PDF Takeoff Form if you haven’t already or use your own tablet or computer to record your answers.

Vertical Fan Coil - Sheet Metal Test #2
Vertical Fan Coil – Sheet Metal Test #2

Use the below section view to help you determine the correct pieces.

Elevation View of Vertical Fan Coil Sheet Metal Takeoff Test #2
Elevation View of Vertical Fan Coil Sheet Metal Takeoff Test #2
Vertical Fan Coil Sheet Metal Takeoff Test #2 Form
Vertical Fan Coil Sheet Metal Takeoff Test #2 Form

Rooftop Packaged Unit Ductwork #3

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following. Start with the Supply Air.

Compare your answers to the Answer Sheet to see how well you did. If you missed any duct or fitting try to determine why, and or spend more time familiarizing yourself with the application of that missed item.

Rooftop Packaged Unit Ductwork #3
Rooftop Packaged Unit Ductwork #3
Rooftop Packaged Unit Ductwork #3 Takeoff Form
Rooftop Packaged Unit Ductwork #3 Takeoff Form

Resources

PDF Takeoff Form

Answers to Test #2

Additional Sheet Metal Takeoff Chapters

Sheet Metal Takeoff – Test 1

VAV Low Side Ductwork #1

In the following series of test there will be no numbered items given. It will be up to you to determine what you need. Start as always at the source or the largest duct and continue along the main until you get to the end, and then go back and pickup each branch.

Make sure that you completed all the practice test first.

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following takeoffs. These forms have more spaces than you should need for each test.

Write down a description of the duct or fitting along with the appropriate size if shown. After you have completed your takeoff, check your answers with the online answer sheet.

VAV Low Side Ductwork Test #1
VAV Low Side Ductwork Test #1

Fill in the PDF Takeoff Form with answers to VAV Low Side Ductwork #1 Image Above.

VAV Low Side Ductwork #1 Takeoff Chart - Test #1
VAV Low Side Ductwork #1 Takeoff Form – Test #1

VAV Low Side and Exhaust Ductwork #2

Below is another VAV Low Side and Exhaust Ductwork practice takeoff for you to get comfortable recognizing how different engineers represent the various fittings that are not defined. Keep the Supply separate from the exhaust in your takeoff.

Again, don’t worry about the lengths of ducts, just indicate that there is a section of duct required. Download the PDF Takeoff Form if you haven’t already or use your own tablet or computer to record your answers.

VAV Low Side and Exhaust Ductwork #2
VAV Low Side and Exhaust Ductwork #2

Fill in the PDF Takeoff Form with answers to VAV Low Side and Exhaust Ductwork #2 Image Above.

VAV Low Side and Exhaust Ductwork #2 Takeoff Form
VAV Low Side and Exhaust Ductwork #2 Takeoff Form

VAV High Side Ductwork #3

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following. Begin your takeoff where indicated on the drawing as “Start Here”. Number your takeoff and identify all the VAV high side ductwork and fittings the start until finished.

Compare your answers to the Answer Sheet to see how well you did. If you missed any duct or fitting try to determine why, and or spend more time familiarizing yourself with the application of that missed item.

VAV High Side Ductwork #3
VAV High Side Ductwork #3

Fill in the PDF Takeoff Form with answers to VAV High Side Ductwork #3 Image Above.

VAV High Side Ductwork #3 Takeoff Form
VAV High Side Ductwork #3 Takeoff Form

Resources

PDF Takeoff Form

Answers to Test #1

Additional Sheet Metal Takeoff Chapters

Sheet Metal Takeoff – Practice Test 3

VAV Low Side Ductwork #3

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following practice takeoffs. Write down a description of the duct or fitting along with the appropriate size if shown. After you have completed your takeoff, check your answers with the online answer sheet.

VAV Low Side Ductwork
VAV Low Side Ductwork

Download and Fill in the PDF Takeoff Form with answers to VAV Low Side Ductwork #3 Image Above, or record your answers somewhere so that you can compare it to the answer sheet below.

VAV Low Side Ductwork - Practice TEST #3
VAV Low Side Ductwork – Practice TEST #3

VAV Low Side Ductwork #4

Below is another round supply VAV Low Side Ductwork practice takeoff for you to get comfortable recognizing how different engineers represent the various fittings that are not defined. Again, don’t worry about the lengths of ducts, just indicate that there is a section of duct required. Download the PDF Takeoff Form if you haven’t already or use your own tablet or computer to record your answers.

VAV Low Side Ductwork #4 - Practice Takeoff
VAV Low Side Ductwork #4 – Practice Takeoff

Fill in table below for each of  the numbered items shown in this image along with the description of the duct or fitting along with its size. Don’t worry about the lengths of duct at this time, just indicate if it’s a section of duct or the type of fitting.

After completing the sheet metal takeoff check your answers online with the corresponding answer sheet below for this practice test.

VAV Low Side Ductwork #4 Practice Test #3 Takeoff Form
VAV Low Side Ductwork #4 Practice Test #3 Takeoff Form

VAV Low Side Ductwork #5

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following.

VAV Low Side Ductwork #5 Practice Test
VAV Low Side Ductwork #5 Practice Test
VAV Low Side Ductwork #5 Practice Test #3 Takeoff Form
VAV Low Side Ductwork #5 Practice Test #3 Takeoff Form

Resources

PDF Takeoff Form

Answers to Practice Test #3

Additional Sheet Metal Takeoff Chapters

Sheet Metal Takeoff – Practice Test 2

VAV High Side Rectangular Ductwork #1

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list from 1 to 13 for the duct or fittings that are shown on the image below. Write down a description of the duct or fitting along with the appropriate size if shown. Don’t worry about the length of ducts in this exercise. After you have completed your takeoff, check your answers with the online answer sheet.

Rectangular Sheet Metal Practice Test
Rectangular Sheet Metal Practice Test

Fill out the following chart with your answers that match the above image.

VAV High-Side Rectangular Ductwork - Practice Test #2
VAV High-Side Rectangular Ductwork – Practice Test #2

VAV High Side Rectangular Ductwork #2

Review the image below and see if you can fill out the takeoff sheet with the numbers that correspond to the rectangular duct or fittings.

VAV High-Side Rectangular Ductwork #2
VAV High-Side Rectangular Ductwork #2
VAV High-Side Rectangular Ductwork #2 - Practice Test #2
VAV High-Side Rectangular Ductwork #2 – Practice Test #2

VAV Low & High Side Takeoff

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list from 1 to 36 for the duct or fittings that are shown on the image below. Write down a description of the duct or fitting along with the appropriate size if shown. Don’t worry about the length of ducts in this exercise. This is again practice to see if you can correctly identify all the duct and fittings by their correct names.

VAV Low & High Side Takeoff Practice Test
VAV Low & High Side Takeoff Practice Test
VAV Low & High Side Ductwork Practice Test #2
VAV Low & High Side Ductwork Practice Test #2

Additional Sheet Metal Takeoff Chapters

Resources

PDF Takeoff Form

Answers to Practice Test #2