VAV Low Side Ductwork #1

In the following series of test there will be no numbered items given. It will be up to you to determine what you need. Start as always at the source or the largest duct and continue along the main until you get to the end, and then go back and pickup each branch.

Make sure that you completed all the practice test first.

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following takeoffs. These forms have more spaces than you should need for each test.

Write down a description of the duct or fitting along with the appropriate size if shown. After you have completed your takeoff, check your answers with the online answer sheet.

VAV Low Side Ductwork Test #1
VAV Low Side Ductwork Test #1

Fill in the PDF Takeoff Form with answers to VAV Low Side Ductwork #1 Image Above.

VAV Low Side Ductwork #1 Takeoff Chart - Test #1
VAV Low Side Ductwork #1 Takeoff Form – Test #1

VAV Low Side and Exhaust Ductwork #2

Below is another VAV Low Side and Exhaust Ductwork practice takeoff for you to get comfortable recognizing how different engineers represent the various fittings that are not defined. Keep the Supply separate from the exhaust in your takeoff.

Again, don’t worry about the lengths of ducts, just indicate that there is a section of duct required. Download the PDF Takeoff Form if you haven’t already or use your own tablet or computer to record your answers.

VAV Low Side and Exhaust Ductwork #2
VAV Low Side and Exhaust Ductwork #2

Fill in the PDF Takeoff Form with answers to VAV Low Side and Exhaust Ductwork #2 Image Above.

VAV Low Side and Exhaust Ductwork #2 Takeoff Form
VAV Low Side and Exhaust Ductwork #2 Takeoff Form

VAV High Side Ductwork #3

Download the PDF Takeoff form or use your own tablet or computer to record your answers that match the list for each of the following. Begin your takeoff where indicated on the drawing as “Start Here”. Number your takeoff and identify all the VAV high side ductwork and fittings the start until finished.

Compare your answers to the Answer Sheet to see how well you did. If you missed any duct or fitting try to determine why, and or spend more time familiarizing yourself with the application of that missed item.

VAV High Side Ductwork #3
VAV High Side Ductwork #3

Fill in the PDF Takeoff Form with answers to VAV High Side Ductwork #3 Image Above.

VAV High Side Ductwork #3 Takeoff Form
VAV High Side Ductwork #3 Takeoff Form

Resources

PDF Takeoff Form

Answers to Test #1